HOW NEW!
The Jeanneau LEADER 650 preowned is one of the 1989 shipyard models of the year 1989. It is a motorboat of type cabin cruiser with a price of 16,000€. It has 6.5 m length and 2.3 m in beam. Jeanneau LEADER 650 has 1 MERCRUISER engine(s) with 200 HP. It has 1 cabin(s) and 1 bathroom(s). It is located in Alicante, Spain. More data, details, equipment, and condition of this Jeanneau LEADER 650 used for sale can be found below.
We recommend reading the full text in the original language (Spanish) to avoid confusion due to automatic translation.
_
It's a lot of MOTOR and NEW TOLDERS and TAPICERIES.
We recommend reading the full text in the original language (Spanish) to avoid confusion due to automatic translation.
Mechanical and electricity jobs:
1.
Double battery system.
2.
New batteries.
3.
Installation of battery boxes.
4.
New battery wiring installation.
5.
Battery switch installation.
6.
Installation of starboard tambucho for switch batteries and charger.
7.
Engine extinguisher installation.
8.
Change transon complete kit.
9.
We pulled engine and painted with polyurethane paint
10.
Change collectors escape and elbows
11.
Termostato new engine.
12.
Change cooling turbine.
13.
Water delivery, new stainless steel thermostat box.
14.
Fuel line sanitation.
15.
Engine compartment decanter installation.
16.
New silicone plug cables
17.
Water pressure pump and new bilge
18.
New led navigation lights.
19.
Light installation in led bathtub with carbon-finished switch.
20.
Sanitation wired from the employer.
21.
Change all the watches
22.
Patron composition with plotter integration and carbon finishes.
23.
Transducer (sand) new in stern.
24.
New 220v line.
25.
Charge base with external base in stainless steel.
26.
Interior, magnetothermal and thermal line 220v.
27.
Installing box box inner fuse box.
28.
Electric molinete installation.
29.
Electric installation new line molinete.
30.
Reinforced lid anchor well for molinete installation.
31.
New plow anchor with 50m calibrated chain.
32.
Reinforced tub cover for dining table installation.
33.
Molinete Thermal Installation.
34.
Installation internal and exterior motor contact with button.
35.
Removal of bottom taps and closure with fiber. (hull stanking)
36.
New belt.
37.
Stainless proa shield placement.
38.
Change of dyes.
39.
Change of anchors and seat holders.
40.
Stern shower and new shower with button block.
Works of aesthetics and comfort:
1.
Replacement of smoked meths
2.
Replacement of smoked metacrilates (Br and Er). .
3.
Smoked vinyl in cabin porton and windshields.
4.
Substitution of wood by methacrylate with support of beverages in Er's ledge.
5.
Change of the steering wheel.
6.
Running lever upgrade with carbon details.
7.
Botonera complete Patron.
8.
Sea-dek synthetic teka proa sole
9.
Sea-dek synthetic teak bath floor
10.
Sea-dek synthetic teak cabin floor.
11.
Sea-dek synthetic teak bathing floor.
12.
New cabin eye window.
13.
Cornamusas and guides of new ends in stainless steel.
14.
New pipes in stainless steel.
15.
New awning in stainless steel.
16.
Toldo bimini “camel and black” new.
17.
New summer camper.
18.
Full new winter camper (without branding).
19.
New seats.
20.
New seats.
21.
Tapicería in nautical skin textile texture and new foams in stern solarium, proa solarium and radar arch.
22.
Shrimp foam and upholstery in new nautical textile with cushions.
23.
Installation LED lighting with remote control color change and intensity in cabin.
24.
Modification of stairs access cabin to improve accessibility to the concierge.
25.
Installation of chemical, registerable WC that is hidden under the pattern (without opening).
26.
Replacement of shrimp cloth carpeting by white gelcoat paint.
27.
Painted by window beautifiers (white).
28.
Covered in white nautical skin in ceilings and flat cabin cloths.
29.
Painted interior shrimp and wooden tops.
•
The boat has only gone down to the water in the summer months.
•
Sweat and hibernation on ship.
•
Annual maintenance and annual patent. The current one's been on for 20 days. He got on August 15, 2024.